|
In late 2006, the Surveyor's Office was contacted about a pond that was constructed over the E. E. Edwards Regulated Tile Drain. Due to the circumstances involving this, Surveyor Newman determined that additional information was needed downstream of the ponds location. On December 18, 2006, the survey field crew completed a survey of the E. E. Edwards Regulated Drain for this purpose. |
|